Is the type of the connection cost allocation policy considered "deep" (supporting transmission connection for RE generation)?
-
Does the grid code include measures or standards addressing variable renewable energy?
-
Does the country have a grid code that clearly specifies connection procedures?
-
Do the connection procedures meet international best practices?
-
Are there rules defining the allocation of connection costs?