Questions
-
Renewable grid integration
-
Does the country integrate high quality forecasting for any variable RE resources (either through subscription service or provided by national agencies) into their dispatch operations?
-
Does the country carry out regular assessments of the flexibility of the electricity grid and the issues relating to renewables integration?
-
Can renewable energy projects sell into balancing/ancillary services?
-
Are there rules for exchanging power between balancing areas that penalize variable renewable energy, e.g. through imbalance penalties? (only scored in countries with multiple balancing areas)
-
Are there provisions in the power exchange rules that allow for plant forecasting? (only scored in countries with multiple balancing areas)
-
Are dispatch operations being carried out in real time?
-
-
Network usage and pricing
-
Do the rules define the size and allocation of costs for use of the transmission and distribution system (e.g. wheeling charges, locational pricing?)
-
Are there rules that allow electricity customers to purchase power directly from a third party (i.e. an entity other than the designated utility in a service area)?
-
-
Connection and cost allocation
-
Is the type of the connection cost allocation policy considered "deep" (supporting transmission connection for RE generation)?
-
Does the grid code include measures or standards addressing variable renewable energy?
-
Does the country have a grid code that clearly specifies connection procedures?
-
Do the connection procedures meet international best practices?
-
Are there rules defining the allocation of connection costs?
-